Elevate People, Not Boondoggles!
ELEVATE PEOPLE, NOT BOONDOGGLES!
As consultants and
construction contractors in the Chamber of the 1% salivate over the prospect of
spending further millions of your money to lay the groundwork to grab hundreds
of millions more, it’s time for the people of Salem to
send a clear message to every elected official within 100 miles:
It’s
an obscenity to pour money down the planning rathole for a project that backers are trying to sell with an ever-changing
rationale but will never be
built, in a city that is so apathetic to the actual residents’ needs that it
doesn’t even provide weekend bus service.
We’re against blowing four
to eight hundred million dollars on an enormous elevated boondoggle.
What are we for instead? It’s
simple: we are for ELEVATING what’s right, not what’s wrong.
· We support elevating people, not pork-barrel
bridges.
· We support elevating transit in Salem above the level of a
third-world country.
· We support elevating transparency over the backroom,
backscratching maneuvers by politicians conspiring with their campaign funders,
the maneuvers that produced this camel pretending to be a racehorse.
· We support elevating honest government instead of the
profits of the CH2M-Hills and the others sucking at the teat of a giant pork
project.
· We support elevating health for people by spending on projects that support biking and pedestrians, not just drivers.
· We support elevating downtown Salem businesses,
not the ones in Keizer and beyond West Salem.
· We support elevating the needs of the “bridgehead”
neighborhoods over the profits of the contractors who want to destroy those
neighborhoods.
For all those reasons and
more, that is why we support elevating the “Salem River Crossing” just enough
to drop it in the trash can and move on to more important things.
Labels:
Bridgasaurus,
corporadoes,
corporate welfare,
Politics,
Salem
Monday, December 16, 2013
Great letter re: Bridgeasaurus Boondogglus
If the Bridgeasaurus Boondogglus "Oversight Team" weren't doing so much dealing from the bottom of the deck, these kinds of comments would not be necessary, but thank goodness someone submitted them. The "Oversight Team" should be focused on ensuring that the "Edifice Complex" doesn't result in a gargantuan waste of resources in the name of a passing auto-dominated era, instead of being focused on how to package and sell a still-evolving proposal that's typical of the worst thinking of that era. But the Oversight Team was and remains stacked with unabashed Bridgasaurus boosters, pols who are firmly committed to a retrograde vision of more auto infrastructure (more is better).
*Comments to Oversight Team on the Salem Alternative for the Salem River Crossing *
I urge the Oversight Team to keep in mind the Purpose and Need for the DEIS that you have developed.In summary, the project will attempt to reduce congestion levels at the existing bridgeheads and remediate safety and operational deficiencies in the existing bridges and in the
study area (DEIS, ES-2). The federal regulations point out that the focus of the alternatives analysis in the EIS is "to serve as the means of assessing the environmental impact of proposed agency actions, rather than justifying decisions already made" (40 CRF Sec. 1502.2(g)). The purpose of this expensive study process is NOT to justify building a new bridge over the river on the outskirts of Salem.As the Federal Highway Administration points out:
"The decision-making process should first consider those alternatives which meet the purpose and need for the project at an acceptable cost and level of environmental impact relative to the benefits which will be derived from the project" (U.S. FHWA memorandum, 9/18/90).
Please consider the following comments and observations as you continue to review the alternatives in the Salem River Crossing DEIS:
*1.**The Oversight Team must do a thorough traffic comparison of the Salem Alternative with all of the other alternatives in the DEIS.*
The information available to date on the new Salem Alternative does not adequately compare the new hybrid alternative with other reasonable alternatives in the DEIS. The information available from the Oversight Team's October meeting compares the Salem alternative only with alternative 4D and a "no build" alternative. That is not consistent with NEPA requirements.
The Salem Alternative was proposed by the Salem City Council as an alternative to Alternative 4D, which was recommended by the Oversight Committee.Alternative 4D was never selected as the"preferred alternative." That process requires the concurrence of the cities of Salem and Keizer, Polk and Marion Counties, SKATS MPO and ODOT.Then FHWA ultimately selects the preferred alternative.That process has not yet happened.
Therefore, in order to determine if the Salem Alternative is truly the best alternative, it must go through the same process as the other alternatives in the DEIS. The alternatives analysis is the heart of the environmental impact statement.It should present the environmental impacts of the proposal and the alternatives in comparative form, thus sharply defining the issues and providing a clear basis for choice among options by the decision maker and the public (40 CFR, Sec. 1502.14).
The Oversight Team is required to "rigorously explore and objectively evaluate all reasonable alternatives, and for alternatives which were eliminated from detailed study, briefly discuss the reasons for their having been eliminated."
Before you make a new recommendation to the decision makers,the Salem Alternative must go through the same analysis as the prior recommendation did.If the other alternatives are being discarded, you should explain why.For example, the hand out from the November Oversight
Team Meeting contained traffic comparisons of the Salem Alternative with Alternative 4D and the No Build Alternative but none of the other alternatives...
...It is clear that the biggest impact of the Salem Alternative is the increase in congestion for several intersections in north Salem. Liberty and Pine, Liberty and Hickoryand Commercial and Pine do not benefit from the Salem Alternative.(The numbers for Commercial St. and Hickory Street are somewhat of an anomaly it appears.)Traffic between downtown Salem and Keizer would suffer. In addition, for the most part the Salem Alternative increases congestion at the Commercial/ Marion and Marion/Liberty Street intersections as compared to Alternative 2A.
2.***The Oversight Team should be sure that the traffic study done for the Salem Alternative uses the same assumptions that were usedto analyze all of the DEIS alternatives.*
The traffic analysis for all of the alternatives needs to take into account current data reflecting travel behaviors.Traffic levels are already well below the estimate in the DEIS.Studies find that Americans
continue to drive less than they did several years ago, and it is not related to the recession.(See Statesman Journal article, December 5, 2013.)
3.*The Salem Alternative is clearly not designed to be an "expressway" as was anticipated by the Keizer city council.*
Expressways do not have bicycle/pedestrian facilities, and the v/c ratio for Salem should be .85 or less, according to the Oregon Highway Plan. Keizer's interest in a free-flowing thoroughfare from I-5 and Keizer Station to Polk County would be thwarted by the number of on-grade intersections proposed in the Salem Alternative.From what I can tell from the drawings and description, twonew intersections on the east side of the river and six on the west side would slow traffic considerably. At
least some of those intersections presumably would have traffic lights.The Oversight Team must compare the travel times of the Salem Alternative with the other alternatives, as done in Table 3.1- 35 in the DEIS.
4.***The true cost of the Salem Alternative should take into account the cost of a new interchange on Highway 22.*
The proposed Salem Alternative eliminates the west bound access to Rosemont in West Salem.That traffic is supposed to use Wallace Road or Edgewater, decreasing the usefulness of the new facility for those residents headed for the west end of West Salem. The Salem Alternative requires another new, expensive project to fix that access problem, and kicks the can down the road for many West Salem residents.
5.***The Salem Alternative will require goal exceptions on the west side, and maybe an extension of the urban growth boundary.*
Those exceptions will be difficult to justify when some of the alternatives, particularly 2A, are reasonable and do not require any exceptions.Any analysis needs to evaluate minor revisions to 2A that do not require exceptions.There may be refinements to 2A that would reduce congestion (such as the full extension of Marine Drive,further reduction of private access onto Wallace Road[1] , and signage to channel traffic into the correct lanes before getting on the bridge from the east.) Other refinements would include retro-fitting to make the existing bridges more earthquake proof; and emergency vehicle access to the bicycle/pedestrian bridge from the west.
6.***The Oversight Team should urge that Salem move forward with the construction of Marine Drive, which is already in the Salem Area TSP.*
That project can be built independently of any alternative in the DEIS.Marine Drive would take a considerable amount of pressure off of Wallace Road, which would greatly relieve the back up onto Marion Street Bridge.Salem could re-evaluate the congestion at the bridge heads after
the new Marine Drive is built to see if a new, expensive bridge can still be justified.
Thank you for your consideration.
Kathy Lincoln
------------------------------------------------------------------------
[1] I recently counted 8 private approaches on to Wallace Road on *each *side of the road,between Edgewater and Glen Creek. Many businesses have more than one driveway to Wallace Road and also have alternative access to the side or rear of the property. Closing those accesses would go a long way toward alleviating congestion on Wallace Road.
Labels:
Bridgasaurus,
citizen activism,
Great Stuff,
Salem
Monday, May 20, 2013
Thursday, December 6, 2012
Stop "Bridgasaurus Boondogglus" petition building up steam!
We're building up steam, but we still need you and all your friends to sign a petition to tell the SKATS agencies to stand up to that most dangerous creature, Bridgasaurus Boondogglus, a fossil unearthed from the 1950s Highway Planning, fossil-fuel wasting mindset.
We need many signatures to tell SKATS to keep Bridgasaurus from putting an $800+ million stomp on the Highland, Grant, and West Salem neighborhoods and from destroying Wallace Marine Park ... not to mention eating up precious resources from everyone in Salem.
The Chamber of Commerce and the Homebuilders are working day and night to push this monstrosity. They have paid folks twisting arms in local governments. We have the facts, logic, reason and common sense on our side, and people power. But we only have that power if people stand up and say that we're not interested in blowing hundreds of millions on a gigantic time-warp highway dinosaur.
If you want to see how absurd this project is, look at the "funding" options game --
http://salemrivercrossing.org/Funding.aspx
The projected local damage for this thing -- $30,000,000 a YEAR for 30 years -- is the exact amount that Salem-Keizer schools is projected to fall short next year (after already laying off hundreds, including every middle and elementary school librarian). And that's with the West Salem library hours cut to 16 a week. And NO transit service on weekends at all, in Oregon's capital city.
We've reached some signers already. But if we are going to have an impact, it's critical that more people sign our petition to Salem Keizer Area Transportation Study agencies.
Our petition is herehttp://signon.org/sign/no-bridgasaurus-in-salem --
please sign and spread it around: http://signon.org/sign/no-bridgasaurus-in-salem
Can you please forward that link to five of your friends right now -- or to everyone in your address book who will be hammered by this thing? With your help, we can reach our goal!
P.S. If you want to stay involved in the battle against Bridgasaurus, you can get on the No3rdBridge mailing list -- go here and request an invitation to join the list: